My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• signature or initials of the CQA Monitor. <br />7.03 PHOTO DOCUMENTATION: <br />The CQA Monitor shall photograph all phases of construction. <br />7.04 DESIGN AND SPECIFICATION CHANGES: <br />During construction, the need to address design and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which will notify the <br />DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION changes shall <br />only be made with written agreement from the MANAGER and DESIGN ENGINEER. <br />7.05 WEEKLY PROGRESS REPORTS: <br />The CQA Monitor shall prepare weekly progress reports summarizing all construction and CQA activities. <br />This report shall be submitted to the MANAGER and shall include the following information: <br />• date, project name, and location; <br />• summary of construction related activities; <br />• summary of geomembrane deployed (per day); <br />• summary of samples taken and test results; <br />• summary of geomembrane areas completed, and approved for Drain Cover Fill placement; <br />• summary of deficiencies and/or defects and resolutions; and <br />• signature of the CQA Monitor. <br />7.06 CONSTRUCTION CERTIFICATION REPORT: <br />ame0 <br />At the completion of the project, the CQA Monitor shall submit to the MANAGER a Construction <br />Certification Report. This report shall certify that the work has been performed in compliance with the <br />design DRAWINGS and project SPECIFICATIONS and will contain the following information: <br />■ summary of all construction activities; <br />• observation and test data sheets; <br />• photographic documentation; <br />■ CQA staff scheduling; <br />■ copies of weekly reports; <br />• CONTRACTOR'S subgrade acceptance forms; <br />• temperature monitoring results; <br />Section 01400.2 Page 10 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />S: \Projects \1125E CCV CQA \I - Tech Specs \01400 2 r1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.