My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Field Samples <br />1. Geomembrane sampling and testing shall be conducted in accordance with the project <br />SPECIFICATIONS for the following: <br />a. trial seam testing (Article 3.07 of this Section) <br />b. destructive seam testing (Article 3.09 of this Section) <br />2. CONTRACTOR shall maintain on -site a minimum of one spare operable tensiometer and <br />provide documentation indicating that all tensiometers used at the project were calibrated <br />within 60 days prior to the tensiometer arriving on -site for testing field samples. <br />E. In order to prevent wind- damaged geomembranes from being placed, the following Quality <br />Assurance procedures shall be followed: <br />1. CONTRACTOR shall perform its Work and utilize sufficient ballast as necessary to <br />prevent wind uplift of the geomembrane panels. <br />2. If wind damage should occur, CERTIFYING ENGINEER shall determine if the <br />geomembrane shall be repaired or replaced. Wind damage to the geomembrane will include <br />wrinkles, creases, and tears, as determined by CERTIFYING ENGINEER <br />3. Repair or replacement of the wind - damaged geomembrane shall be completed by <br />CONTRACTOR at no additional cost to CC &V. <br />4. As determined by MANAGER and CERTIFYING ENGINEER, the geomembrane panel <br />may be rejected at no cost to CC &V. <br />1.04 DELIVERY, STORAGE, AND HANDLING <br />A. Packing and Shipping <br />1. Labels on each roll delivered to Site shall identify the following. <br />a. MANUFACTURER'S name <br />b. Product Identification <br />c. Thickness <br />d. Roll number <br />e. Batch or lot number <br />f. Panel number (when applicable) <br />g. Roll dimensions <br />2. CONTRACTOR shall ensure that geomembrane rolls are properly loaded and secured to <br />prevent damage during transit. <br />Section 02776 Page 5 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />C:\AMEC_CC &V\Phase 5 VLF \PSSA Cert Report\Appendices\Appendix E \SPECS \02776 r1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.