My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02200 <br />Earthworks <br />amec <br />2. No brush, roots, sod, frozen material, or other deleterious or unsuitable materials shall be <br />incorporated in the fills. The suitability of all materials intended for use in the fill shall be <br />subject to approval by MANAGER and CERTIFYING ENGINEER. Fill placement shall <br />be temporarily stopped by CONTRACTOR due to weather conditions, if materials and <br />installation do not meet the SPECIFICATIONS, at no cost to CC &V. Fill shall not be <br />placed upon frozen material, such as snow or ice. <br />3. If the surface of the prepared foundation or the surface of any layer of the fill is too dry or <br />too smooth to bond properly with the layer of material to be placed thereon, it shall be <br />moisture- conditioned and/or worked with harrow, scarifier, disc, or other suitable equipment <br />to provide a satisfactory bonding surface before fill material is placed thereon. If the surface <br />of the prepared foundation or the rolled surface of any layer is excessively wet for fill <br />materials to be placed thereon, it shall be removed and allowed to dry or worked with a <br />harrow, scarifier, disc, or other suitable equipment to reduce the moisture content to an <br />acceptable level or meet project specifications as determined by MANAGER and <br />CERTIFYING ENGINEER. It shall then be compacted before the next layer of fill <br />material is placed. Determination of such dry or wet conditions shall be made by <br />CERTIFYING ENGINEER. <br />4. The distribution of materials shall be such that the fill is free from voids, lenses, pockets, <br />streaks, or layers of material differing substantially in texture or gradation from the <br />surrounding material. The material of a fill shall be as described in Article 2.01 of this <br />Section. <br />5. Unless otherwise approved by MANAGER and CERTIFYING ENGINEER, the entire <br />fill surface shall be at or near the same elevation at all times during construction. At all <br />times during construction, the surface of the fill shall be graded and maintained by the <br />CONTRACTOR to prevent ponding of water and to allow for storm water drainage. <br />6. Except as otherwise specified or approved by MANAGER and CERTIFYING <br />ENGINEER, the CONTRACTOR shall dump and spread fill in such a manner so that no <br />excessive gaps are left between successively dumped loads of materials. The fill shall be <br />leveled prior to compaction by means of a dozer or grader, or other suitable approved <br />equipment, to obtain a surface free from depressions. <br />7. Except in areas approved by MANAGER and CERTIFYING ENGINEER where space is <br />limited or otherwise specified, CONTRACTOR shall place fill by routing the hauling and <br />spreading units approximately parallel to the axis of the fill. As far as practical, hauling <br />units shall be so routed that they do not follow in the same paths, but split their tracks evenly <br />across the surface of the fill to enhance compaction. <br />8. CONTRACTOR shall apply water required for moisture conditioning on the fill or in the <br />borrow areas. <br />CONTRACTOR shall maintain fill materials within the moisture content range required to <br />permit proper compaction to the specified density with the equipment being used. The <br />moisture content of the fill materials, prior to and during compaction, shall be uniform <br />throughout each layer of the material. <br />Prior to mixing of wet and dry material on the fill to obtain the proper moisture content, <br />approval shall be obtained from CERTIFYING ENGINEER. Mixed material shall have a <br />uniform distribution of the moisture content prior to placement on the subsequent lift. <br />P \Phase 5 OSA 2011 Cert ReportWppendices\Appendix E Specifications \02200 rt doc <br />Page 8 of 18 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.