Laserfiche WebLink
observe and document that all soil materials placed on top of the geosynthetics are done in <br />such a manner as to ensure that the geosynthetics are not damaged. <br />6.03.01 GEOMEMBRANE: <br />ame0 <br />During geomembrane installation, the CQA Monitor shall observe and document deployment, trial seams, <br />field seaming, non - destructive and destructive seam testing, and repairs to assure that the installation is in <br />compliance with the SPECIFICATIONS. <br />Deployment - The CQA Monitor shall verify that only approved materials are used, each panel is <br />given a unique panel number, no geomembrane is placed during unsuitable weather conditions as <br />outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the geomembrane is not <br />damaged during installation, and anchoring is performed in compliance with the <br />SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the deployment on <br />the deployment log form. <br />Trial Seams - The CQA Monitor shall verify that seaming conditions are performed in compliance <br />with SPECIFICATIONS, tests are performed at required intervals, specified test procedures are <br />followed, and retests are performed in compliance with the SPECIFICATIONS. If the ambient air <br />temperature measured by the CQA Monitor is above 35 °F for the entire day, the INSTALLER <br />shall perform trial seams at the beginning of each crew shift, and immediately following any work <br />stoppage (i.e., for lunch, weather conditions, etc.) of 30 minutes or more for each seaming <br />apparatus used that day. If the ambient air temperature measured by the CQA Monitor is below <br />35 °F for the entire day, the INSTALLER shall perform four (4) trial seams, at approximately the <br />same time interval throughout the scheduled work day. Each Seamer shall make at least one trial <br />seam each day. Seaming operation shall not commence until the CQA Monitor has determined <br />that the seaming process is meeting the SPECIFICATION requirement and is acceptable. The <br />CQA Monitor shall record the trial weld results on the trial seam log form. <br />Field Seaming - The CQA Monitor shall verify that only approved equipment and personnel <br />perform welding, all welding is performed under suitable conditions as specified in the project <br />SPECIFICATIONS, specified overlaps are achieved, seams are oriented in compliance to project <br />requirements, and that grinding techniques and extrudate meet project requirements for extrusion <br />welding. The CQA Monitor shall record all field seaming on field seaming log forms. <br />Non - Destructive Seam Continuity Testing - The CQA Monitor shall verify that all seams and <br />repair are non - destructively tested in compliance with the project SPECIFICATIONS. If a seam <br />cannot be tested, the CQA Monitor shall observe cap strip operations. The CQA Monitor shall <br />verify that test equipment and gauges are functioning properly and that test procedures are in <br />compliance with the project SPECIFICATIONS. The CQA Monitor shall verify that all seams and <br />repairs with failing test results are repaired and/or re- tested until passing results are achieved. The <br />CQA Monitor shall record all non - destructive test locations on the vacuum test and pressure test <br />log forms. <br />Destructive Seam Testing - The INSTALLER shall obtain samples, at locations selected by the <br />CQA Monitor, of the field seamed geomembrane approximately 24 inches along and 12 inches <br />across the seam and centered over the seam as follows: <br />a minimum of one sample per day; <br />• a minimum of one sample for each geomembrane seamer; <br />• a minimum of one sample every 500 feet of seaming; and <br />Section 01400.2 Page 7 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />S \Projects \1125E CCV CQA \I - Tech Specs \01400 2 rt doc <br />