Laserfiche WebLink
Table 8 <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Berm Modification <br />Soil Liner Fill Depth Verification Summary <br />ameO <br />Date <br />Sample <br />Surveyed Location <br />Depth <br />Northing <br />Easting <br />Elevation <br />08/29/12 <br />SLF -1 -D <br />52060.0 <br />38847.5 <br />9827.9 <br />12.50" <br />08/29/12 <br />SLF -2 -D <br />52039.5 <br />38814.4 <br />9818.2 <br />12.00" <br />08/29/12 <br />1 SLF -3 -D <br />1 52125.8 <br />38878.7 <br />9837.6 <br />14.50" <br />08/29/12 <br />1 SLF -4 -D <br />1 51982.6 <br />38653.3 <br />9804.1 <br />12.25" <br />Ii <br />