Laserfiche WebLink
Table 1 <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Berm Modification <br />Summary of Earthworks Material Specifications <br />w ZO <br />FMT <br />Plasticity <br />Permeability Grain Size <br />Distribution <br />Material <br />Percent Passing <br />Index <br />cm /sec Sive Size <br />Select Structural Fill N/P <br />N/A Y <br />100 <br />(SSF) <br />Soil Liner Fill <br />2" <br />100 <br />10 min <br />1.0E -06 (max) <br />SLF <br />No. 200 <br />15 -65 <br />N /P- Non - Plastic, N /A- Not Applicable Page 1 of 1 <br />