Laserfiche WebLink
ameO <br />7.0 CONCLUSIONS <br />In accordance with our responsibilities as the Project Engineer and as the Quality <br />Assurance Consultant for construction of the Phase 5 Berm Modification, and per the <br />requirements of the various applicable DRMS approvals, AMEC Environment and <br />Infrastructure Inc. (AMEC) attests that it observed and performed the required CQA activities <br />during construction of the Phase 5 Berm Modification. Based on daily communications with <br />AMEC personnel, observations made during on -site visits, and review of the laboratory and <br />field test results, AMEC attests that the Phase 5 Berm Modification was constructed in <br />compliance with the design plans and specifications as described in this document. <br />Sincerely, <br />AMEC Environment & Infrastructure, Inc. <br />seph !DHiclk6y <br />Resident CQA Supervisor <br />Jay Janney- Moore, P.E. <br />Certifying Engineer/ Project Manager <br />ACW /JDH /JJM <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 27 <br />