Laserfiche WebLink
5.2.3 Welding Rod QC Certificates ......................................... ............................... 18 <br />6.0 GEOMEMBRANE CQA TESTING AND MONITORING .................... .............................19 <br />6.1 Conformance Testing .............................................................. ............................... 20 <br />6.2 Deployment Monitoring ........................................................... ............................... 20 <br />6.3 Seaming .................................................................................. ............................... 22 <br />6.3.1 Trial Seam Monitoring .................................................... ............................... 22 <br />6.3.2 Seaming Observations ................................................... ............................... 23 <br />6.4 Defect and Repair Observations ............................................. ............................... 24 <br />6.5 Destructive Testing .................................................................. ............................... 24 <br />6.6 Non - Destructive Testing ............................................................ .............................25 <br />7.0 CONCLUSIONS ................................................................................... .............................27 <br />LIST OF TABLES <br />Table 1 <br />Summary of Earthworks Material Specifications <br />Table 2 <br />Summary of Weather Data <br />Table 3 <br />Fill Temperature Monitoring Summary <br />Table 4 <br />Earthworks CQA Test Summary & Testing Frequency <br />Table 5 <br />CQA Laboratory Test Summary — Select Structural Fill <br />Table 6 <br />CQA Laboratory Test Summary — Soil Liner Fill <br />Table 7 <br />Field Density and Moisture Content Test Summary — Soil Liner Fill <br />Table 8 <br />Soil Liner Fill Depth Verification Summary <br />LIST OF FIGURES <br />Figure 1 Site Plan <br />Figure 2 Certification Boundary Limit <br />Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />Figure 4 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />LIST OF IFC DRAWINGS <br />Drawing A500 <br />Phase 5 Ramp Modification Existing Conditions <br />Drawing A501 <br />Phase 5 Ramp Modification Berm Raise Plan and Profile <br />Drawing A502 <br />Phase 5 Ramp Modification Berm Raise Details <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 <br />www.amec.com <br />