My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-04_HYDROLOGY - C1980004
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980004
>
2013-01-04_HYDROLOGY - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:47 PM
Creation date
1/8/2013 9:11:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
HYDROLOGY
Doc Date
1/4/2013
Doc Name
4th Quarter 2012 GroundWater
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Other Ground Water
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: November 8, 2012 <br />Weather Conditions: Clear, -65 -70 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek -2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW -6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />Fourth Quarter 2012 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />Feet <br />GW -1 Total Depth 14.3 <br />GW -3 Total Depth 47.3 <br />GW -6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. ,� - , sio <br />GW -9 Total Depth 53.5 ��� = '°' '. ^;d <br />O "r ° • <br />• <br />II ' <br />• • <br />1*: 1 <br />• 0 0 rt' <br />40 V diT*1 <br />Surface Water <br />Sample <br />Time <br />Flow <br />(cfs) <br />pH <br />p <br />EC <br />umhos /cm <br />Temp (C) <br />p ( ) <br />SW -1 <br />1:15 PM <br />Dry <br />- <br />- <br />- <br />SW-2 <br />1:15 PM <br />Dry <br />- <br />- <br />- <br />SW-3 <br />12:45 PM <br />Dry <br />- <br />- <br />- <br />SW-5 <br />1:20 PM <br />Dry <br />- <br />- <br />- <br />SW-8 <br />12:30 PM <br />Dry <br />- <br />- <br />- <br />McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: November 8, 2012 <br />Weather Conditions: Clear, -65 -70 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek -2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW -6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />Fourth Quarter 2012 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />Feet <br />GW -1 Total Depth 14.3 <br />GW -3 Total Depth 47.3 <br />GW -6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. ,� - , sio <br />GW -9 Total Depth 53.5 ��� = '°' '. ^;d <br />O "r ° • <br />• <br />II ' <br />• • <br />1*: 1 <br />• 0 0 rt' <br />40 V diT*1 <br />Ground Water <br />Sample <br />Time <br />SWL <br />(feet) <br />pH <br />p <br />EC <br />umhos /cm <br />Temp (C) <br />p ( ) <br />GW -1 <br />1:00 PM <br />10.3 <br />7.4 <br />6600 <br />13.8 <br />GW -3 <br />12:40 PM <br />39.9 <br />7.1 <br />4300 <br />13.9 <br />GW -6 <br />12:50 PM <br />Dry-18.8' <br />GW -9 <br />1:25 PM <br />26.1 <br />7.4 <br />7300 <br />13.4 <br />McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: November 8, 2012 <br />Weather Conditions: Clear, -65 -70 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek -2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW -6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />Fourth Quarter 2012 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />Feet <br />GW -1 Total Depth 14.3 <br />GW -3 Total Depth 47.3 <br />GW -6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. ,� - , sio <br />GW -9 Total Depth 53.5 ��� = '°' '. ^;d <br />O "r ° • <br />• <br />II ' <br />• • <br />1*: 1 <br />• 0 0 rt' <br />40 V diT*1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.