Laserfiche WebLink
1. <br />5731 State Highway 13 • Meeker, Colorado 81641 <br />December 27, 2012 <br />Mr. Rob Zuber <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Colowyo Coal Company L.P., Mine Permit C -81 -019, Preliminary Adequacy Review, <br />Permit Renewal 6 (RN -06) <br />Dear Mr. Zuber, <br />COAL <br />COMPANY 4 <br />40 <br />OP t.E•PRODDC"CI OS• <br />• 970- 824 -1500 <br />R ECEJVED <br />DEC 3 1 2012 <br />Divi8ion of Reclamation, <br />Mining & Safety <br />Colowyo Coal Company L.P. (Colowyo) received preliminary adequacy review comments <br />from the Division of Reclamation, Mining and Safety (Division) on December 19, 2012 <br />via email from Mr. James Stark. Colowyo has the following responses to Mr. Stark's <br />comments: <br />You provided a "Table 1 — Summary of 2017 Bond Volumes" with the renewal <br />materials. The volume listed for the Eastern and Western stockpiles (South Taylor <br />stockpiles) is 52,822,000 CY. Based on the changed to these stockpiles in TR -81 <br />(South Taylor /Lower Wilson — Rule 4, page 20), there is a total temporary volume of <br />approximately 43,700,000 CY and a permanent volume of approximately 47,400,000 <br />CY. This gives a total stockpile volume of approximately 91,000,000 CY. These <br />numbers differ significantly from those shown in "Table 1" (both the temporary and <br />the permanent volumes). What is the correct out -of -pit spoil for each temporary <br />stockpiles. If the stockpile volume numbers differ from those listed in the permit, a <br />revision will need to be submitted to update these numbers. Further, since these <br />volumes are for a constructed fill, stability analyses and construction plans will need <br />to be provided as well. <br />Response: Colowyo has very recently submitted a TR which proposes a new spoil <br />configuration and updated volumetric's for the permanent and temporary <br />overburden stockpile in South Taylor. However, since this revision has not been <br />approved and will not be approved before the renewal, Colowyo agrees the most up <br />to date volumes are the ones approved under TR -81. <br />2. In the "Table 1" you provide a volume for "Area 1 ", which is the facilities area, the <br />West Pit and the Roads, of approximately 10,3000,000 CY. Based on the TR -81 cost <br />estimate, there was a West pit reclamation volume of approximately 13,100,000 CY <br />.a Wcsrern Fuel,- Colorado, I.I.( 1 /li//iJl( property <br />