Laserfiche WebLink
UNITED STATES LIME & MINERALS, INC. <br />COLORADO LIME CO. <br />1468 HIGHWAY 50 <br />DELTA, CO 81416 <br />(970) 874 -8300 <br />2012 MONARCH QUARRY TONNAGE <br />PERMIT NO. M- 2000 -098 <br />Rock to Salida Plant 4413 tons <br />Rock to Delta Plant 45352 tons <br />Pit run 504 tons <br />Screened rock 0 tons <br />Aglime from stockpile 0 tons <br />Total 50269 tons <br />December 20, 2012 <br />Activity at the mine in 2012 began in early January 2012 and continued through the end of November. No <br />limestone or dolomitic limestone was mined in 2012 and no mining is planned for 2013. Removal of previously <br />out of spec material was the only reclamation done in 2012 and is the only reclamation planned for 2013. We <br />anticipate the removal of 40 -60k tons of material in 2013. The proposed areas for removal are noted on the <br />attached map. <br />