Laserfiche WebLink
Additional Pages <br />2012 Annual Report <br />Fountain Pit <br />M -1982 -155 <br />Schmidt Construction Company <br />Anniversary Date: December 31 <br />Expected Activity (2013): Mining activity in 2013 may be considerably greater than has been seen in many <br />years. A large project will require a great deal of material. Thus the zone on the map showing the future mining <br />is nearly 40 acres. It is not known if that is what will be affected, but it is possible. It is also possible that the <br />approximately 8.1 acres between the pit and the powerlines will also be mined However, that is dependent <br />upon obtaining permission from the owner of the powerlines to mine land closer than the 200 foot limitation <br />currently imposed by the permit. Elsewhere on an adjacent mining operation (not Schmidt's) mining has <br />occurred to within 50 feet of the powerlines. If that permission is obtained, a change will in the permit will be <br />sought to incorporate that into the permit. It is known that good material is available in that area. <br />Schmidt Construction Company <br />2012 Annual Report M- 1982 -155 Fountain Pit Page 1 of 1 <br />