My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-28_REPORT - M1976009HR
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1976009HR
>
2012-12-28_REPORT - M1976009HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:42 PM
Creation date
1/7/2013 3:14:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976009HR
IBM Index Class Name
REPORT
Doc Date
12/28/2012
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Page <br />2012 Annual Report <br />Menzer Quarry <br />M- 1976- 009 -HR <br />Schmidt Construction Company <br />Anniversary Date: December 31 <br />Acreage Changes: The total affected land at this quarry, when compared to 2011, appears to have declined <br />In fact, that is not correct. On the ground, the amount of disturbance (affected land) is the same as last year <br />with nothing added or removed. The difference in acreage is due to a redefinition of how the units are laid out <br />on the map. In the past, stripped land was derived by determining the area of stripped land and subtracting <br />areas where there was an overlap with other units. The map was modified so that stripped land is defined <br />without any overlaps. That resulted in both a shifting of the stripped land acreage value as well as any lands that <br />previously overlapped that unit. Other units were also redefined in various ways which, when all was totaled, <br />resulted in what appears to be an 8 acre reduction in affected land. In fact, previous measurements were too <br />high because of errors caused by determining the overlap areas. Thus, the 102 acres is much closer to the <br />correct value than 110 acres. <br />Future Map Changes: In the next year it is expected that older topography lines that represent the original <br />topography will be modified to more accurately reflect the actual topography. Of course, the actual topography <br />is constantly changing, but enough changes have occurred since the 2004 base map that including those changes <br />on the master map is justifiable. Some changes were shown previously in the amendment for the corrective <br />action, but elsewhere changes have also occurred and those need to be updated. These changes will be close <br />estimated. Due to the high cost of remapping the entire site, these adjustments will serve to keep the map fairly <br />close to true until a remapping can be done in future years. <br />Schmidt Construction Company 2012 Annual Report M -76- 009 -HR Menzer Quarry Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.