My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 5: MEETINGS <br />ame0 <br />This section identifies and describes the meetings to be held during the course of the construction. Meetings <br />shall be held in order to clearly define construction activities and goals in order to facilitate construction. <br />5.01 PRECONSTRUCTION MEETING: <br />MANAGER will hold a preconstruction meeting at the site prior to the start of construction. MANAGER, <br />DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, and others <br />designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br />• review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />• define the responsibilities of each party; <br />• define lines of communication and authority; <br />■ review method of documentation, testing procedures, and reporting inspection data; <br />• establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; <br />• discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design; and <br />• This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.02 PROGRESS MEETINGS: <br />MANAGER will hold a daily progress meeting, either before the start of work or at the completion of work. <br />At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The purpose of this <br />meeting will be to: <br />• review all the previous day's accomplishments and activities; <br />• review scheduled work location and activities for the day; <br />■ discuss any problems or potential construction problems; and, <br />• review test data. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, these <br />meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a design <br />issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be present. The <br />meeting will be documented by the CQA Monitor. <br />Section 01400.1 Page 4 of 10 <br />Earthworks CQA Plan <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.