My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Prior to shipment, the GCL MANUFACTURER shall label each roll, identifying: <br />1. Product identification information (MANUFACTURER's name and address, brand product <br />code). <br />2. Lot number and roll number. <br />3. Roll length, width and weight. <br />2.03 PACKAGING <br />3.02 STORAGE <br />amec <br />A. The GCL shall be wound around a rigid core whose diameter is sufficient to facilitate handling. The <br />core is not necessarily intended to support the roll for lifting but should be sufficiently strong to <br />prevent collapse during transit. <br />B. All rolls shall be labeled and bagged in packaging that is resistant to photo degradation by ultraviolet <br />(UV) light. <br />2.04 ACCESSORY BENTONITE <br />A. The granular bentonite sealing clay used for overlap seaming, penetration sealing and repairs shall be <br />made from the same natural sodium bentonite as used in the GCL and shall be as recommended by <br />the GCL MANUFACTURER. Seaming of GCLs shall be conducted in accordance with the <br />MANUFACTURER's guidelines. <br />PART 3: EXECUTION <br />3.01 SHIPPING AND HANDLING <br />A. The MANUFACTURER assumes responsibility for initial loading of the GCL. Unloading, on -site <br />handling and storage of the GCL are the responsibility of the CONTRACTOR, INSTALLER or <br />other designated party. <br />B. A visual inspection of each roll should be made during unloading to identify if any packaging has <br />been damaged. Rolls with damaged packaging should be marked and set aside for further inspection. <br />The packaging should be repaired prior to being placed in storage. <br />C. The party responsible for unloading the GCL should contact the MANUFACTURER prior to <br />shipment to ascertain the appropriateness of the proposed unloading methods and equipment. <br />A. Storage of the GCL rolls shall be the responsibility of the INSTALLER. A dedicated storage area <br />shall be selected at the job site that is away from high traffic areas and is level, dry and well drained. <br />B. Rolls should be stored in a manner that prevents sliding or rolling from the stacks and may be <br />accomplished by the use of chock blocks. Rolls should be stacked at a height no higher than that at <br />which the lifting apparatus can be safely handled (typically no higher than four). <br />C. All stored GCL materials and the accessory bentonite must be covered with a plastic sheet or <br />tarpaulin until their installation. <br />D. The integrity and legibility of the labels shall be preserved during storage. <br />Section 02776.1 Page 4 of 7 <br />Geosynthetic Clay Liner (GCL) <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.