Laserfiche WebLink
Test Description <br />Test Method <br />Specification Requirement <br />Point Load Tensile Strength <br />ISRM RTH 325 -89 /ASTM <br />D5731 <br />300 psi (min) <br />SECTION 02271.0 RIP RAP <br />PART 1: GENERAL <br />1.01 DESCRIPTION <br />Section 02271 <br />Rip Rap <br />ame0 <br />All work shall be carried out in compliance with these SPECIFICATIONS and in conformance with the lines, <br />grades, and dimensions as shown on the DRAWINGS. <br />1.02 RELATED SECTIONS <br />Refer to the following Sections for related work: <br />Section 02200.0 Earthworks <br />Section 03300.0 Cast -in -place Concrete <br />PART 2: SPECIFICATIONS AND INSTALLATION <br />2.01 MATERIAL SPECIFICATIONS <br />A. Rip rap shall consist of hard, dense, and durable stone, angular in shape, and resistant to weathering. <br />Rounded stone or boulders will not be accepted as riprap material. The stone shall have a specific <br />gravity of at least 2.5. Each piece shall have its greatest dimension not greater than three times its <br />least dimension. If approved by CERTIFYING ENGINEER, removed concrete may be used for <br />riprap provided it meets the other requirements of this section. <br />B. Material used for riprap will be approved by CERTIFYING ENGINEER if, by visual inspection, <br />the rock is determined to be sound and durable. MANAGER and CERTIFYING ENGINEER <br />may require CONTRACTOR to furnish laboratory results to verify that the material meets <br />SPECIFICATIONS. At the request of MANAGER, CONTRACTOR shall furnish laboratory test <br />results indicating that the material meets the requirements for strength as indicated in the following <br />table. <br />Page 1 of 2 <br />June 19, 2012 <br />Revision 1 <br />