Laserfiche WebLink
copies of weekly reports; <br />• CONTRACTOR'S subgrade acceptance forms; <br />• temperature monitoring results; <br />• geosynthetic quality control documents; <br />• geosynthetic quality assurance documents; <br />• geomembrane installation observations, such as for deployment, trial seams, defect repair, <br />destruct testing and non - destructive testing; <br />• sampling, testing locations, and test results; <br />• changes to the design DRAWINGS or project SPECIFICATIONS and the justification for <br />these changes; <br />• record DRAWINGS; and <br />• a certification statement that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />* ** END OF SECTION * ** <br />Section 01400.2 Page 11 of 11 <br />Geosynthetic CQA Plan <br />ame0 <br />June 19, 2012 <br />Revision 1 <br />