Laserfiche WebLink
6.02 GEOMEMBRANE CONFORMANCE TESTING: <br />• Geomembrane: density (ASTM D1505) <br />carbon black content (ASTM D1603) <br />thickness (ASTM D5199) <br />tensile strength (ASTM D6693) <br />shear strength (ASTM D4833) <br />amec9 <br />Prior to geosynthetic installation, the CQA Monitor shall obtain samples of the geomembrane for <br />conformance testing to confirm that these materials meet project requirements. The conformance testing <br />frequency shall be at a rate of 1 test per 150,000 square feet or 1 test per resin lot, whichever is greater. <br />Samples shall be taken across the entire width of the roll and shall not include the first 3 feet. The samples <br />shall be 3 feet wide by the roll width. The CQA Monitor shall mark the machine direction, roll number on <br />the sample, and date the sample was obtained and forward the sample to a third party geosynthetic <br />laboratory. As a minimum, the following conformance tests shall be conducted; with project requirements <br />outlined in Section 02776, Article 2.01: <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS. The CQA <br />Monitor shall review the test results and shall report any nonconformance to the MANAGER, <br />CERTIFYING ENGINEER and the INSTALLER. <br />6.03 CONSTRUCTION MONITORING AND TESTING: <br />The CQA Monitor shall monitor and test all geosynthetic components of the construction to verify that the <br />construction is in compliance with the project SPECIFICATIONS. The CQA Monitor shall identify <br />inadequate construction methodologies or materials which may adversely impact the performance of the <br />facility being constructed and existing structures. Visual observations throughout the construction process <br />shall be made to ensure that the materials are placed to the lines and grades as shown on the DRAWINGS. <br />The CQA monitor shall review the following submittals by INSTALLER during the project: <br />• verification that a qualified land surveyor has verified all lines and grades; and <br />• subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by the INSTALLER. <br />The CQA Monitor shall: <br />• Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document any <br />damage and notify MANAGER; <br />• obtain geosynthetic packaging identification slips for verification and generation of an on -site <br />materials inventory; <br />• observe subgrade conditions prior to geosynthetics installation and verify that any <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br />• observe permanent anchoring of geosynthetics to verify that design and project <br />SPECIFICATIONS are met; <br />Section 01400.2 Page 6 of 11 <br />Geosynthetic CQA Plan <br />June 19, 2012 <br />Revision 1 <br />