ameO <br />217 linear feet of seam was extrusion welded using one extrusion welding machine /welding <br />technician combinations. Two destructive test samples were marked during extrusion seaming. All <br />destructive tests performed were within project specifications. Non - destructive testing was <br />performed for fusion welded seams. Repairs were performed using the extrusion welding method <br />for all marked defects. Vacuum testing was performed for all extrusion welded seams and repairs. <br />B) Geomembrane Exposure <br />No work performed during the week. <br />C) Anchor Trench <br />Anchor trench was excavated using a John Deere 35D excavator and one laborer. The anchor <br />trench was inspected by an AMEC field representative and found to be constructed in accordance <br />with design drawings and project specifications. <br />D) Geomembrane Acceptance <br />No geomembrane was accepted during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed, assisted, and performed testing during placement of SLF for the PSES project. <br />AMEC inspected and approved subgrade for geomembrane deployment within the PSES project. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the PSES project. <br />AMEC observed anchor trench excavation for the PSES project. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />SLF placement within the PSES project. <br />Subgrade acceptance prior to geomembrane deployment within the PSES project. <br />Anchor trench excavation within the PSES project. <br />Geomembrane installation within the PSES project. <br />Anchor trench backfill within the PSES project. <br />Geomembrane acceptance within the PSES project. <br />DCF placement within the PSES project. <br />PSES Weekly Report WE 05.19.2012 <br />