Laserfiche WebLink
CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation for the PSES project. <br />AMEC observed slope contouring for the PSES project. <br />AMEC observed and assisted on the placement of SLF for the PSES project. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Subgrade preparation within the PSES footprint <br />Slope contouring within the PSES footprint. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V.• <br />CC &V held a weekly construction meeting on May 1, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly <br />May 5, 2012. _4PIr <br />Joseph Hickey, CQA Mon <br />Approved By: <br />our findings and observations for the week ending <br />May 5, 2012 <br />Date: p � /r%` Z <br />PSES Weekly Report WE 05.05.2012 <br />