Laserfiche WebLink
AM �• <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed the preparation of subgrade <br />AMEC observed slope contouring. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Subgrade preparation within the PSES footprint <br />Slope contouring within the PSES footprint. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC &V held a weekly construction meeting on April 24, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represent ur findings and observations for the week ending <br />April 28, 2012. <br />Joseph Hickey, CQA Mon <br />April 28, 2012 <br />Approved By: -I )Dater <br />PSES Weekly Report WE 04.28.2012 <br />