Laserfiche WebLink
" 4W <br />W17-1 <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEM_ S <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Structural fill placement within the PSES footprint. <br />Slope contouring within the PSES footprint. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC&V held a weekly construction meeting on April 10, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly repres our findings and observations for the week ending <br />April 14, 2012.x% <br />Joseph Hickey, CQA Mon <br />Approved By: <br />April 14, 2012 <br />Date: &I,',4 `// Z- <br />PSES Weekly Report WE 04.14.2012 <br />