Laserfiche WebLink
amecv <br />AMEC observed the structural fill placement. Ambient and fill temperatures were monitored during fill <br />placement. <br />AMEC observed construction of the sediment basin and culvert. This included fine grading, GCL <br />placement, geotextile placement, and rip -rap placement. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Plannine Items: <br />Continue structural fill placement <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC &V held a weekly construction meeting on November 8, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents/lIcalth & Safety Issues: <br />None <br />We trust the information provided clearly repres s our findings and observations for the week ending <br />November 12, 2011. n . <br />Joseph Hickey, CQA <br />Approved By: <br />Date: November 12, 2011 <br />: /ej olq <br />PSES Weekly Report WE 11. 12.2011 <br />