My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (11)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 1:51:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Section 1- Cover to Append. B.2 Doc. Photos.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2.6 Temperature Monitoring <br />ame0 <br />approximately 50 feet of each other during DCF placement. AMEC verified that wrinkles in <br />the geomembrane did not fold over, that PVC grade markers were placed on a maximum <br />50 -foot by 50 -foot grid and at grade breaks, and that material in the fill was suitable. AMEC <br />continuously inspected geomembrane during DCF placement, marked areas for repair, if <br />required, and verified that all repairs were completed to project specifications. After final <br />grading, AMEC monitored removal of PVC grade markers. <br />AMEC monitored ambient air temperatures using a Davis Vantage Pro 2 data - logging <br />weather system. Temperatures were measured every hour. The lowest and highest daily <br />temperatures are summarized in Table 2. <br />During placement of fill materials, when the ambient air temperature was less than 32 °F for <br />longer than one hour in the previous 24 hours, AMEC was required to monitor the fill <br />temperatures at depths of 3 inches and 6 inches, at a frequency of 6 tests per acre, and <br />calculate the average fill temperature from the lower temperature of the 3 -inch and 6 -inch <br />tests. No frozen materials were placed during the construction of the Process Solution <br />Enhancement System. Fill temperature monitoring is summarized in Table 3. <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.