My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (11)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 1:51:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Section 1- Cover to Append. B.2 Doc. Photos.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2.1 Subgrade Preparation <br />ame6 <br />AMEC monitored subgrade preparation, including verification that Ames compacted the <br />subgrade with a smooth drum vibratory roller (SDVR) compactor. AMEC verified that Ames <br />removed protruding rocks from the subgrade surface prior to SLF placement. AMEC verified <br />that the subgrade surface was moisture conditioned, smooth, and unyielding prior to SLF <br />placement. <br />4.2.2 Site Grading <br />AMEC monitored site grading. The SF contained more than 30 percent by weight larger than <br />% -inch particle size, and was placed by method specification (per Specification 2200 <br />Section 3.06). <br />AMEC verified that the SF maximum particle size of the fill did not exceed 24 inches, and <br />that lifts were no thicker than one and one -half times the maximum particle size. When SF <br />was placed for slope reduction, AMEC verified that Ames scarified in -situ materials prior to <br />fill placement. AMEC verified that Ames made a minimum of four passes with the SDVR <br />compactor. <br />AMEC verified that the SSF maximum particle size of the fill did not exceed 3 inches, and <br />that lifts were no thicker than one foot (compacted). AMEC verified that Ames made a <br />minimum of four passes with the SDVR compactor. <br />4.2.3 Soil Liner Fill <br />Field testing included monitoring of placement and preparation of SLF for geomembrane <br />deployment, testing in -place moisture and density with a nuclear gauge, and monitoring <br />depth verification to project specifications. <br />AMEC Environment & Infrastructure, Inc <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.