Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 INTRODUCTION 1 <br />1.1 Project Description 1 <br />1.2 Construction Quality Assurance /Construction Quality Control 2 <br />1.2.1 CQA Monitoring of Earthworks 2 <br />1.2.2 CQA/CQC Monitoring of Geosynthetics Installation 4 <br />1.3 Project Coordination 4 <br />1.3.1 Daily Construction Summary Reports 5 <br />1.3.2 Weekly Construction Summary Reports 5 <br />1.4 Project Specifications 5 <br />1.5 Record Survey Documentation 6 <br />1.6 Certification Boundary 6 <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION 7 <br />2.1 Underground Workings Remediation 8 <br />2.2 Site Grading 8 <br />2.3 Stormwater Control System 9 <br />2.4 Subgrade Preparation 9 <br />2.5 Soil Liner Fill 9 <br />2.6 Process Solution Enhancement System Composite Liner System 10 <br />2.7 Drain Cover Fill 11 <br />3.0 GEOSYNTHETICS INSTALLATION 13 <br />3.1 Process Solution Enhancement System Liner System 13 <br />3.2 Stormwater Control System 13 <br />4.0 EARTHWORK CQA TESTING AND MONITORING 14 <br />4.1 Results of Laboratory Soils Testing 14 <br />4.1.1 Grain Size Distribution 15 <br />4.1.2 Moisture Content 16 <br />4.1.3 Atterberg Limits 16 <br />4.1.4 Proctor Compaction Tests 17 <br />4.1.5 Permeability Tests 18 <br />4.2 Field Testing and Monitoring 18 <br />4.2.1 Subgrade Preparation 19 <br />4.2.2 Site Grading 19 <br />4.2.3 Soil Liner Fill 19 <br />4.2.3.1 Field Monitoring 20 <br />4.2.3.2 Moisture - Density Test Results 20 <br />4.2.3.3 Depth Verification 20 <br />4.2.4 Pipe Bedding Material 21 <br />4.2.4.1 Field Monitoring 21 <br />4.2.4.2 Moisture - Density Test Results 21 <br />4.2.5 Drain Cover Fill 21 <br />4.2.6 Temperature Monitoring 22 <br />5.0 GEOSYNTHETICS QC SUBMITTALS 23 <br />5.1 Geomembrane Installation Personnel Resumes 23 <br />AMEC Environmenta & Infrastructure, Inc <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec corn ii <br />ame9 <br />