My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (11)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 1:51:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Section 1- Cover to Append. B.2 Doc. Photos.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 Stormwater Control System <br />amed <br />Ames constructed the Stormwater Control System in the Process Solution Enhancement <br />System, at the location shown in Record Drawing No. 4 of 4. <br />A collection basin was installed at the inlet of the Stormwater Control System culvert. The <br />basin was lined with 8 oz non -woven geotextile and rip rap. <br />Ames excavated the Stormwater Control System culvert trench to a minimum 5 -foot by 5- <br />foot cross - sectional dimension. Ames placed 1 -foot of PBM and one 36 -inch diameter <br />corrugated polyethylene (CPE) pipe in the trench. The trench was backfilled with PBM, with <br />a minimum 1 -foot of cover over the pipe. Ames placed approximately 504 linear feet of CPE, <br />and 9,040 cubic yards of PBM in the Stormwater Control System. <br />The culvert discharges into existing stormwater controls. The toe of the Process Solution <br />Enhancement System fill was protected from infiltration at the collection basin and culvert <br />inlet by GCL. <br />2.4 Subgrade Preparation <br />Prior to SLF placement, Ames moisture conditioned and compacted the entire surface of the <br />Process Solution Enhancement System with a smooth drum vibratory compactor according <br />to the project specifications. The quality of the finished surface was then maintained to the <br />project specifications until SLF was placed. <br />2.5 Soil Liner Fill <br />Based on neat -line survey, Ames placed and compacted approximately 5,140 cubic yards of <br />SLF in the Process Solution Enhancement System to project specifications. Record <br />Drawing No. 2 of 4 in Appendix A presents the as -built surface of the SLF. <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec.com 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.