Laserfiche WebLink
Graham Roberts, TMI <br />January 7, 2013 <br />TR110 Adequacy Review No. 1 <br />Page 2 of 2 <br /> <br />6. Section IV of the revised Appendix Q; Section XXXI removed the special sampling requirements for <br />NPDES 011 (East Pyeatt) discharge point as approved in the current plan. The currently approved <br />procedure ensures the spring in this drainage does not bias the results of sampling at this point. It is <br />unclear why these instructions were not retained in the sampling procedures and updated to account for <br />the new sampling frequency. Please explain why this paragraph was removed or revise the procedures to <br />include updated instructions for this NPDES discharge point. <br /> <br />This concludes the Division’s review of this technical revision, the decision date for the revision is February 18, <br />2013. The above items will need to be addressed to the Division’s satisfaction prior to the decision date. If <br />additional time is needed to addresses these items please request an extension of the decision date. If you have any <br />questions, please feel free to contact me. <br /> <br />Sincerely, <br /> <br />Environmental Protection Specialist <br />DRMS <br /> <br /> <br /> <br /> <br />