Laserfiche WebLink
Permitter Name: Continental Materials <br />Corporation <br />Operation Name: Daniels Sand Pit 2 <br />Annual Fee Due: $791.00 _ <br />Permit Acreage: 352.30 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit. an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will he performed during the upcoming year, the <br />date. for the beginning of active operations. and the date active operations ceased for the year. <br />Information contained in this report will he reviewed by the 1)iv;sion upon receipt and prior to the next compliance <br />inspection of the site If. while completing this report, you learn: that your site is not in compliance with the rules and the <br />act. it is advisable that the issues be rectified promptly to avoid possible enforcement action_ <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)'' <br />If "YES." please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. 1L'hat was the date of last excavation, processing or hauling activity at the mine? <br />5. <br />Does the nine operate more than 160 days per year? <br />If "NO ". please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />h) approval for INTERMI ITENT OPERATION'? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />h. Number of acres that were newly affected during the current re po rt RECEIVED <br />9. Number of acres that were reclaimed during the current report year. V <br />10. Estimated new acreage to he affected in the next report year. <br />DIVISION OF RECLAMATION <br />I I . I ?stintatcd acres to be reclaimed in the next report year. MINING AND <br />12. Total acres in various stages of reclamation, n, since permitted mining activities b eat <br />Total acres stages <br />acres Total acres <br />hucklillcd: 0 seeded w/ 0 w /topsoil <br />approved mix: <br />Total acres <br />fertilized w/ <br />aped fertilizer: <br />'Total acres <br />graded: <br />Seed <br />application <br />method: <br />0 <br />Fertilizer <br />application <br />method: <br />112c Annual Report <br />D <br />Permit Number: M -1973- 007 -SG <br />County: <br />Anniversary Date: <br />Current Bond Amt: <br />replaced: <br />Topsoil <br />replacement <br />depth (in.): <br />Ja <br />El Paso <br />January 7.2013 <br />$1,038,500.00 <br />JAN 0 4 2013 <br />0 <br />Mulch <br />application <br />method: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons /ac): <br />Page 2 of 3 <br />Fm <br />(94- <br />0 <br />l� <br />N() <br />YES NO <br />YES <br />-) in eiLt"T <br />1;S N <br />YES <br />Y1:S <br />0 <br />i•TA <br />