Laserfiche WebLink
Year <br />Month <br />( <br />( <br />( <br />( <br />( <br />( <br />( <br />( <br />Average <br />Inflow Rate <br />Average <br />Inflow Rate <br />Days of Month <br />Needed for <br />Filling <br />Volume of Pit <br />Filled During <br />Month <br />Volume <br />Remaining to <br />be Fillled (End <br />of Month) <br />Lagged <br />Depletions <br />from Pit <br />Filling <br />Call Period <br />Below <br />Shoshone <br />Out -of- Priority <br />Depletions <br />from Pit <br />Filling <br />(gpm) <br />(AF /Day) <br />(Days) <br />(AF) <br />(AF) <br />(AF) <br />(days) <br />(AF) <br />£60Z <br />January <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0 <br />0.00 <br />February <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0 <br />0.00 <br />March <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0 <br />0.00 <br />April <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />4 <br />0.00 <br />May <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />5 <br />0.00 <br />June <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />14 <br />0.00 <br />July <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />31 <br />0.00 <br />August <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />31 <br />0.00 <br />September <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0 00 <br />30 <br />0.00 <br />October <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />31 <br />0.00 <br />November <br />500 <br />2.21 <br />0 <br />0.00 <br />80.00 <br />0.00 <br />14 <br />0.00 <br />December <br />500 <br />2.21 <br />31 <br />68.50 <br />11.50 <br />26.22 <br />0 <br />0.00 <br />PLOZ <br />January <br />500 <br />2.21 <br />5 <br />11.50 <br />0.00 <br />26.66 <br />0 <br />0.00 <br />February <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />11.38 <br />0 <br />0.00 <br />March <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />5.81 <br />0 <br />0.00 <br />April <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />3.99 <br />4 <br />0.53 <br />May <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />3.07 <br />5 <br />0.49 <br />June <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />2.52 <br />14 <br />1.17 <br />July <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.35 <br />31 <br />0.35 <br />August <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />31 <br />0.00 <br />September <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />30 <br />0.00 <br />October <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />31 <br />0.00 <br />November <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />14 <br />0.00 <br />December <br />0 <br />0.00 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0 <br />0.00 <br />Total <br />- <br />- <br />36 <br />80.00 <br />-- <br />80.00 <br />2.55 <br />P \061- 052 \060- Debeque Gravel Pit \SWSP \2012 -2013 SWSP \Updated SWSP for 2 Year Renewal\ Wright Water Engineers, Inc <br />Table 4 <br />Debeque Gravel Pit <br />Pit Filling Analysis <br />Notes: <br />1) Based on conservative estimate of inflow rate using linear change in inflow over time and averaged throughout the total pit filling <br />2) Column (1) x (1,440 minutes per day / 325,851 gallons per AF) <br />3) If (Column (5) from the previous month / Column (2)) is greater than # of days in the month, than use # of days in month, if not then use (Column (5) from previous month / Column (2)). <br />4) Column (2) x Column (3) <br />5) Previous month minus Column (4) <br />6) Lagged to nver based on Glover Analysis wth transmiss vity = 50,880 gallons per day per foot, specific yield = 0 20, and distance from centroid of Phase 1 Pit Area to Colorado River = 906 feet Final 10% of <br />depletions (months August Through November) redistnbuted amongst first 90% of depletions (months Decmber through July) <br />7) Based on Colorado River Call Records from 1987 to 2011 and conversations with Judy Sappington (Colorado River Administrator) For 2012, conservative estimate is last two weeks of June through the first two <br />weeks of November <br />8) Column (6) x (Column (7) / number of days in each month) <br />Tables Updated for 2 Year Renewal Updated Call Period xlsx <br />7/6/2012 <br />Des by RMN <br />Ckd by PRF <br />