My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_PERMIT FILE - P2012018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2012018
>
2012-12-27_PERMIT FILE - P2012018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:40 PM
Creation date
1/3/2013 3:18:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012018
IBM Index Class Name
PERMIT FILE
Doc Date
12/27/2012
Doc Name
NOI APPLICATION, FORM 2
From
ROYAL USA INC
To
DRMS
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendices — DRMS Form 2 Public <br />Royal USA Inc. Wray Mesa NOl <br />Drilling Information <br />Twenty -four holes are proposed for the claimed lands. Approximate GPS coordinates (UTM NAD83 <br />Zone 12) and hole particulars are shown in Table 1. The holes will start in sediments belonging to the <br />Brushy Basin shale member of the Morrison formation or Dakota sandstone, ending in or just below the <br />Salt Wash Member of the Morrison Formation. <br />Table 1: Proposed Drill Hole Location Particulars <br />CONFIDENTIAL <br />Drilling will be done by a truck- mounted rotary rig capable of drilling from approximately 1,000 feet to <br />1,500 feet, such as a Gardner - Denver 1500 or equivalent. Drill hole diameter will be in the 5 "to 6 "range, <br />and cuttings will be removed from the hole by airlift. Although considered unlikely, a nominal 1,000 gal <br />to 2000 gal water truck will be available if water is needed to make an air /foam mixture. If an air foam <br />mixture is needed, then the foaming agent will be an environmentally benign, nonhazardous and non- <br />toxic product such as Quik- FoamTM or equivalent. <br />Cuttings will be directed into the containment pits at each site and mineralized cuttings will be <br />segregated within the pit. <br />Probing will be accomplished with a truck- mounted probe or portable unit possessing gamma and <br />electric logging tools. No tool with a radioactive source will be used. Water from the water truck may be <br />added to the hole to improve the down -hole electrical characteristics, however this is unlikely. <br />Surface Disturbance <br />No roads will be constructed. The anticipated surface disturbance will be the possible excavation of 24, <br />nominal, 10 foot x 10 foot by 3 foot deep containment pits for cuttings and, if needed, airlifted water <br />from the drill holes. The estimated disturbed area for the pit and stockpiled material will be about 13ft X <br />18ft or 234ft or 0.005 acres per site. The test pits will be within the larger 30 ft x 65 ft proposed drill <br />pads. For bonding calculations, the entire 1,950 square foot drill pad will be considered "disturbed" <br />although this is highly unlikely. Total surface disturbance therefore is estimated to be about 1.07 acres. <br />Given the equipment and mud pit constraints, a pad can be a more amorphous shape than indicated <br />above as it is configured to fit around minor topographic and vegetative features. Figure A -1 is a <br />schematic drawing of a proposed pad with equipment locations and cuttings /fluid flow. <br />Appendices Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.