Laserfiche WebLink
Task description: <br />Site: Hansel Pit #1 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 12/31/2012 County: Phillips Filename: M036 -001 <br />User: BMK <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8U <br />Horsepower: 310 <br />Blade Type: Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $213.74 <br />Total Fleet Cost/Hour: $213.74 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,327 <br />Swell factor: 1.230 <br />Loose volume: 17,622 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Unadjusted hourly production: 400.0 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 5 % <br />Average site altitude: 4,069 feet <br />CUT SLOPES TO 4:1 <br />Material weight: 2,100 lbs/LCY <br />Weight description: Earth - Loam <br />Permit Action: M- 2010 -036 Permit/Job #: M2010036 <br />$63.92 <br />$104.06 <br />$8.34 <br />$37.41 <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.200 <br />Dozing method: 1.000 <br />BULLDOZER WORK <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />