Laserfiche WebLink
12/27/12 State.co.us Executive Branch Mail - Need for a well permit ? <br />[Quoted text hidden] <br />Keffelew - DNR, Berhan <berhan.keffelew @state.co.us> <br />To: Berhan Keffelew - DNR <berhan.keffelew @state.co.us> <br />On Thu, Dec 20, 2012 at 4:24 PM, Keffelew - DNR, Berhan <br /><berhan.keffelew @state.co.us> wrote: <br />Forwarded message <br />> From: Williams - DNR, Joanna <joanna.williams @ state.co.us> <br />> Date: Thu, Dec 20, 2012 at 11:25 AM <br />> Subject: Re: Need for a well permit ? <br />> To: "Keffelew - DNR, Berhan" <berhan.keffelew @state.co.us> <br />> Cc: Jonathan Hemandez - DNR <jonathan.hemandez @state.co.us> <br />> Good Moming Berhan, <br />> According to the Hazeltine Mine, Revision No. TR -01 surface drainage <br />> will be directed to a wetwell, that does not have a connection with <br />> groundwater, prior to discharge. As long as the "wetwell" does not <br />> intercept or otherwise pump groundwater, as stated in the Revision No. <br />> TR -1, a well permit is not required. Since the wetwell will <br />> temporarily store surface water all water captured in the wet well <br />> must be pumped out within 72 hours. Also, all water captured and <br />> pumped must be retumed to the stream system without consumption, <br />> unless a SWSP or augmentation plan is obtained to replace depletions. <br />> If you have any questions please let me know. <br />> Thanks <br />> Joanna <br />» » <br />» » <br />» » <br />» > <br />» > <br />» > <br />» > <br />» > <br />>— <br />> J <br />Keffelew - DNR, Berhan <berhan.keffelew @state.co.us> <br />To: Tony Waldron - DNR <tony.waldron @state.co.us> <br />Tony, <br />FYI <br />[Quoted text hidden] <br />https: / /mail.google.com /mail /u /0 / ?ui= 2 &ik =ef d71408a1 &v iew =pt& search = inbox &th= 13bb380767867183 <br />- k nell <br />Thu ec 27, 2012 at 7:04 AM <br />M <br />IN\ Mom <br />SE(�• <br />Thu, Dec 27, 2012 at 7:07 AM <br />4/4 <br />