My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-26_HYDROLOGY - M2003091
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2003091
>
2012-12-26_HYDROLOGY - M2003091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:39 PM
Creation date
12/27/2012 10:08:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003091
IBM Index Class Name
HYDROLOGY
Doc Date
12/26/2012
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates
Permit Index Doc Type
Hydrology Report
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes: <br />(1) Based upon Table 1. <br />(2) Based upon Table 1. <br />(3) Based on Table 2. <br />(4) Equal to (1) + (2) + (3). <br />Ns/At, con.n li.tnle [il, \lio /' IJRO iDFN 411oc1A(l. INC <br />Table 3 <br />Martin Marietta Materials <br />Duckworth Pit <br />2012 -2013 Combined Total Lagged Depletions and Replacements <br />Depletions <br />Replacements <br />(5) Credit from dewatering is based upon Table 2. An average dewatering pumping rate of 1,000 gallons per minute is assumed based upon MMM estimates. <br />(6) It is anticipated that the dewatering credit from the Duckworth Pit will be adequate to replace the depletions at the Duckworth Pit. Therefore, no Rural <br />Ditch credits are shown. However, if additional replacement supplies are necessary, Martin Marietta Materials owns 2 shares of the Rural Ditch which have <br />an average annual consumptive use credit of 90.1 ac -ft. <br />(7) It is anticipated that the dewatering credit from the Duckworth Pit will be adequate to replace the depletions at the Duckworth Pit. Therefore, no excess <br />augmentation credits for MMM's South Platte Combined SWSP (WDID 0202581) are shown. However, if additional replacement supplies are necessary, <br />excess augmentation credits from the South Platte Combined SWSP will he exchanged up to the point of the Duckworth depletions on Boulder Creek per <br />approval of the water commissioner. <br />(8) Equal to (5) + (6) + (7). <br />(9) Equal to (8) - (4). <br />( <br />( <br />( <br />( <br />( <br />( <br />(7) <br />( <br />( <br />Estimated <br />Credit from <br />Lagged Net <br />Lagged <br />Lagged <br />De- Watering <br />Rural <br />Excess Credit <br />Evaporation <br />Production <br />Dewatering <br />Total Lagged <br />Operations at <br />Ditch <br />from South <br />Total <br />Net Effect <br />Depletions <br />Depletions <br />Depletions <br />Depletions <br />Duckworth (ac <br />Credits (ac- <br />Platte Combined <br />Replacements <br />to the River <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />ft) <br />ft) <br />SWSP (ac -ft) <br />(ac -ft) <br />(ac -ft) <br />Nov -12 <br />0.00 <br />0.00 <br />0.05 <br />0.05 <br />99.95 <br />99.95 <br />99.91 <br />Dec -12 <br />0.00 <br />0.00 <br />0.39 <br />0.39 <br />99.61 <br />99.61 <br />99.21 <br />Jan -13 <br />0.00 <br />0.00 <br />2.14 <br />2.14 <br />97.86 <br />97.86 <br />95.72 <br />Feb -13 <br />0.00 <br />0.00 <br />5.09 <br />5.09 <br />94.91 <br />94.91 <br />89.83 <br />Mar -13 <br />0.00 <br />0.00 <br />8.43 <br />8.44 <br />91.57 <br />91.57 <br />83.13 <br />Apr -13 <br />0.00 <br />0.01 <br />11.88 <br />11.89 <br />88.12 <br />88.12 <br />76.23 <br />May -13 <br />0.01 <br />0.06 <br />15.12 <br />15.19 <br />84.88 <br />84.88 <br />69.68 <br />Jun -13 <br />0.01 <br />0.12 <br />18.17 <br />18.30 <br />81.83 <br />81.83 <br />63.53 <br />Jul -13 <br />0.01 <br />0.17 <br />21.02 <br />21.20 <br />78.98 <br />78.98 <br />57.78 <br />Aug -13 <br />0.02 <br />0.25 <br />23.66 <br />23.93 <br />76.34 <br />76.34 <br />52.41 <br />Sep -13 <br />0.02 <br />0.31 <br />26.21 <br />26.54 <br />73.79 <br />73.79 <br />47.25 <br />Oct -13 <br />0.03 <br />0.33 <br />28.56 <br />28.91 <br />71.44 <br />71.44 <br />42.54 <br />Annual Total <br />0.10 <br />1.25 <br />160.71 <br />162.07 <br />939.33 <br />1039.29 <br />877.22 <br />Notes: <br />(1) Based upon Table 1. <br />(2) Based upon Table 1. <br />(3) Based on Table 2. <br />(4) Equal to (1) + (2) + (3). <br />Ns/At, con.n li.tnle [il, \lio /' IJRO iDFN 411oc1A(l. INC <br />Table 3 <br />Martin Marietta Materials <br />Duckworth Pit <br />2012 -2013 Combined Total Lagged Depletions and Replacements <br />Depletions <br />Replacements <br />(5) Credit from dewatering is based upon Table 2. An average dewatering pumping rate of 1,000 gallons per minute is assumed based upon MMM estimates. <br />(6) It is anticipated that the dewatering credit from the Duckworth Pit will be adequate to replace the depletions at the Duckworth Pit. Therefore, no Rural <br />Ditch credits are shown. However, if additional replacement supplies are necessary, Martin Marietta Materials owns 2 shares of the Rural Ditch which have <br />an average annual consumptive use credit of 90.1 ac -ft. <br />(7) It is anticipated that the dewatering credit from the Duckworth Pit will be adequate to replace the depletions at the Duckworth Pit. Therefore, no excess <br />augmentation credits for MMM's South Platte Combined SWSP (WDID 0202581) are shown. However, if additional replacement supplies are necessary, <br />excess augmentation credits from the South Platte Combined SWSP will he exchanged up to the point of the Duckworth depletions on Boulder Creek per <br />approval of the water commissioner. <br />(8) Equal to (5) + (6) + (7). <br />(9) Equal to (8) - (4). <br />
The URL can be used to link to this page
Your browser does not support the video tag.