Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002/ <br />003 -' <br />004' <br />005' <br />006 . <br />007' <br />008 ' <br />009' <br />Backfill mined slopes <br />SCRAPER] <br />37.85 <br />$7,505.62 <br />$8,513.08 <br />$5,651.55 <br />$2,032.04 <br />$34,052.37 <br />$9,633.00 <br />$48,741.11 <br />$90,501.63 <br />$4,840.88 <br />Create 3:1 slopes with backfyll material <br />DOZER <br />54.46 <br />Place topsoil on backfilled slopes <br />SCRAPERI <br />28.50 <br />Grade topsoil on backfilled slope <br />DOZER <br />13.00 <br />Place overburden on pit floor <br />SCRAPERI <br />171.70 <br />Rip plant and stockpile areas <br />RIPPER <br />45.20 <br />Place topsoil in disturbed area - 50 acres <br />SCRAPERI <br />245.77 <br />Reseed 85 acres • <br />REVEGE <br />0.00 <br />Mob /demob equipment <br />MOBILIZE <br />7.20 <br />SUBTOTALS: <br />603.68 <br />$211,471.28 <br />Task description: Cost Summary - 2012 Unit Cost Update <br />Site: Penrose Ranch's <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />12/10/2012 <br />TC1 <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY WORK <br />State: Colorado <br />County: Fremont <br />DRMS <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />1.05% <br />301.84 hrs <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />Permit Action: <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />4.25% <br />5.00% <br />CONTINGENCY: 0.00 <br />2003 AMO2 Unit <br />Cost Update <br />Total = <br />Total = <br />Permit/Job#: M1992016 <br />Abbreviation: None <br />Filename: MO16 -000 <br />$4,271.72 <br />$2,220.45 <br />$17,899.11 <br />$21,147.13 <br />$45,538.41 <br />$257,009.69 <br />500.00 <br />$10,922.91 <br />$12,850.48 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $69,811.81 <br />TOTAL BOND AMOUNT (direct + indirect) = $281,283.09 <br />