Laserfiche WebLink
am&P <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />Dec 2 <br />Dec 3 <br />Dec 4 <br />Dec 5 <br />Dec 6 <br />Dec 7 <br />Dec 8 <br />Joseph Hickey <br />- <br />- <br />- <br />PR <br />PR <br />PR <br />PR <br />Thorne Clark <br />LS <br />LS <br />LS <br />LS <br />- <br />- <br />- <br />Uwe Kelley <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Dennis Koval* <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Ben Melly <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />Robert Redd <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Madison Crouch <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />Ryan Fesler <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Alyssa Wagner <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ron Arlian <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />Engineer <br />Engineer <br />Manager <br />MEW Weekly Report WE 12.08.2012- 1.docx <br />PS = Project Sponsor <br />PCE = Project Certifying <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory <br />SE = Senior Engineer <br />