C) <br />D) <br />II) Geosynthetics <br />A) <br />III) <br />A) <br />IV) <br />Wall <br />Wall <br />ame <br />Soil Liner Fill (SLF) <br />Soil liner fill placement is complete for the Mill Site Earthworks project. This figure has been <br />removed from the weekly reports. <br />Tr. <br />by a <br />lift <br />of <br />DCF <br />when <br />at <br />plans <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement performed in the area shown on Figure 2. The DCF was hauled <br />from the processing area to the placement area using 40 -ton articulating haul trucks loaded <br />CAT 988 (250703) and a CAT 992 (250601) front -end loader. The DCF was placed in a 2 -foot <br />using various CAT dozers except where haul routes were established. Haul routes consisted <br />four -foot lifts to be spread into 2 -foot lifts later. Laborers were present at all times during <br />placement removing debris /sandbags and assisting the dozer operator with lift thickness. All <br />was placed on previously approved primary geomembrane. AMEC field representatives <br />monitored the DCF placement constantly. <br />Temperatures were monitored by an AMEC field representative prior to fill placement <br />ambient temperatures were below 32 °F. Fill material was not placed until the entire fill area was <br />or above 32 °F. Fill temperatures averaged between 33 °F and 45 °F <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Total <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Geomembrane <br />No work performed during the week. <br />Storm Water Management <br />Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />MSE Wall Construction <br />#1 <br />Installation of wall components was performed for Mat's 3 thru 15. An amec field representative <br />inspected and approved placed backfill materials, which was determined acceptable per the <br />and specifications to continue with the installation of the remaining wall components. <br />#2 <br />MEW Weekly Report WE 12.08.2012- 1.docx <br />