My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-21_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2012-12-21_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:36 PM
Creation date
12/26/2012 7:33:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
HYDROLOGY
Doc Date
12/21/2012
Doc Name
September 2012 Groundwater Monitoring Report
From
Holcim
To
DRMS
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACZ Laboratories, Inc. <br />2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 <br />Report to: Bill to: <br />Lauri Yusko Accounts Payable <br />ARCADIS ARCADIS <br />1687 Cole Blvd. Suite 200 630 Plaza Drive Suite 600 <br />Lakewood, CO 80401 Highlands Ranch, CO 80129 <br />cc: Treck Hohman <br />Project ID: B0025510.2012.00001 <br />ACZ Project ID: L97049 <br />Lauri Yusko: <br />Enclosed are the analytical results for sample(s) submitted to ACZ Laboratories, Inc. (ACZ) on September 29, <br />2012. This project has been assigned to ACZ's project number, L97049. Please reference this number in all <br />future inquiries. <br />All analyses were performed according to ACZ's Quality Assurance Plan. The enclosed results relate only to <br />the samples received under L97049. Each section of this report has been reviewed and approved by the <br />appropriate Laboratory Supervisor, or a qualified substitute. <br />Except as noted, the test results for the methods and parameters listed on ACZ's current NELAC certificate <br />letter ( #ACZ) meet all requirements of NELAC. <br />This report shall be used or copied only in its entirety. ACZ is not responsible for the consequences arising <br />from the use of a partial report. <br />All samples and sub - samples associated with this project will be disposed of after November 11, 2012. If the <br />samples are determined to be hazardous, additional charges apply for disposal (typically $11 /sample). If you <br />would like the samples to be held longer than ACZ's stated policy or to be returned, please contact your Project <br />Manager or Customer Service Representative for further details and associated costs. ACZ retains analytical <br />raw data reports for ten years. <br />If you have any questions or other needs, please contact your Project Manager. <br />Sue Webber has reviewed and <br />approved this report <br />REPAD.01.06.05.02 <br />October 11, 2012 <br />Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.