Laserfiche WebLink
Overburden will be placed on the other side, east of the excavation, <br />to protect the east side from erosion. This will place a physical <br />barrier between topsoil and overburden. <br />As each 10 acre plot is mined out, we will begin to replace <br />overburden and topsoil to start the regeneration of plant material. <br />The resources of the local Natural Resources Conservation Service <br />will be used for advice on need for soil tests, terracing, and seeding <br />to insure success for our reclamation. Placing 5 to 8 inches of <br />topsoil should give an ample root zone to start grass to growing. <br />9 <br />