My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-20_REVISION - C1981038 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2012-12-20_REVISION - C1981038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:34 PM
Creation date
12/21/2012 7:32:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
12/20/2012
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Basil Bear Bowie Resources, LLC
Type & Sequence
RN6
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />STATE OF COLORADO <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />December 20, 2012 John W. Hickenlooper <br />Governor <br />Basil Bear Mike King <br />Bowie Resources, LLC Executive Director <br />P.O. Box 1488 Loretta E. Pineda <br />Paonla, CO 81428 Director <br />Re: Proposed Decision <br />Permit Renewal Application No. 6 (RN -6) <br />Bowie No. 1 Mine (Permit No. C- 1981 -038) <br />Dear Mr. Bear: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for Permit <br />Renewal No. 6 at the Bowie No. 1 Mine. Notice of the proposed decision will be published in the Delta County <br />Independent as soon as possible. The first publication will initiate the thirty (30) day public comment period for <br />the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved renewal materials <br />were sent to the Office of Surface Mining and the Bureau of Land Management. The materials should be sent <br />within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. The permit will not be issued until the Division has received and approved the <br />bond. <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />2WAJ 4L1A/lfiMA. <br />Susan L. Burgmaierr ��'' <br />Environmental Protection Specialist <br />Enclosure <br />cc: Jim Stover, J.E. Stover & Associates, with enclosure <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.