My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-19_PERMIT FILE - X201123201
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201123201
>
2012-12-19_PERMIT FILE - X201123201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:30 PM
Creation date
12/19/2012 1:38:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201123201
IBM Index Class Name
PERMIT FILE
Doc Date
12/19/2012
Doc Name
180 Day Report
From
New Elk Coal Company
To
DRMS
Email Name
JDM
DIH
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />RECEIv <br />DEC 192012 <br />COAL EXPLORATION 180 -DAY REPORT Division of Reclamatio' ■ <br />Mining & Safety <br />Prospector: New Elk Coal Company, LLC Notice of Intent No.: NOI -X- 2011 - 232 -01 <br />Address: 12250 State Highway 12 Project Name: 2012 Exploration <br />Weston, CO 81091 County: Las Animas <br />Date: December 6, 2012 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. The purpose of this report is to update <br />the Division on exploration and reclamation activities that have occurred in the past 180 days <br />of active prospecting. The report also indicates any changes in operations from what was <br />stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br />modify this form, or use a different format altogether. <br />1. Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 <br />days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br />activities. (Attach additional pages, if needed.) <br />No activity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.