My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-17_REVISION - M1981088
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981088
>
2012-12-17_REVISION - M1981088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:25:52 PM
Creation date
12/19/2012 7:08:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981088
IBM Index Class Name
REVISION
Doc Date
12/17/2012
Doc Name
SO Appl.
From
Bratton Enterprises, Inc.
To
DRMS
Type & Sequence
SO3
Email Name
BJC
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. RECITALS <br />-4- <br />1. On y ;6-'yo fkr- 1 0 , (CI Permit Number P1 I g 1 0 b was granted to <br />J" ify (existing operator) ( "Permittee "), pursuant to which <br />Permittee has been conducting a mining operation in the County of Ro(,l }-{- , State of Colorado. <br />2. Permittee wishes to assign the permit to zl1 rr1 Fr <br />operator), as Successor Operator ( "Successor ") and Successor wishes to b come SuccSuccessor Permittee under the permit. <br />3. Successor understands that the reclamation plan (the "Plan") required by the permit and by applicable <br />State laws and regulations has not been completed and is willing to assume full responsibility for the completion of <br />the Plan. <br />V. AGREEMENTS <br />Permittee and Successor hereby agree, for their own benefit and for the benefit of the State, such agreements to be <br />effective ipso facto upon the approval by the State of the transfer of the Permit from Permittee to Successor, as <br />follows: <br />I . Successor has inspected the mining and reclamation operations to its entire satisfaction and is fully aware <br />of the conditions thereof. Successor understands and accepts all of the conditions of the Permit. <br />2. Successor will complete the reclamation plan, and hereby assumes liability for completing such plan as to <br />all areas heretofore disturbed, as well as to all areas hereafter disturbed. Successor will perform all of the <br />obligations of the Permittee under the Permit which have not heretofore been performed by Permittee. <br />3. Successor hereby tenders to the State its attached Performance and Financial Warranties *, which are to be <br />substituted for the Performance and Financial Warranties heretofore filed by the Permittee, effective upon the <br />release of the latter Warranties. <br />4. Successor represents to the State that, to the best of its knowledge, information and belief, it is not in <br />violation of any of the provisions of the Colorado Mined Land reclamation Act with respect to any other operation <br />conducted by it in the State of Colorado. <br />Permittee and Successor hereby request the State to consent to the assignment of the Permit, to recognize <br />Successor as Successor Operator under the Permit, and to accept the tendered substitute Performance and Financial <br />Warranties in place of the Warranties presently on file with the State. <br />
The URL can be used to link to this page
Your browser does not support the video tag.