Laserfiche WebLink
December 12, 2012 <br />Jared Ebert <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Honeywood Coal Company <br />Phase III Bond Release <br />Permit C- 1991 -078 <br />Dear Mr. Ebert: <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />J. E. STOVER & ASSOCIATES INC. <br />2352 NORTH 7` STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />The DRMS' letter dated June 12, 2012 listed issues that must be resolved prior to final bond <br />release. Item 4 of the letter addressed the reseeding of Pond A. Pond A was reseeded on <br />December 12th with 30 pounds of pure live seed. <br />Attached is the seed tag and a certification letter from Granite Seed. <br />St -3 <br />RFCEWED <br />DIV1SIOf1 <br />Mining and Safari <br />