My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-17_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2012-12-17_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:27 PM
Creation date
12/18/2012 7:44:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/17/2012
Doc Name
Adequacy Review
From
DRMS
To
Douglas C. White Director ofTechnical Services, Western Fuels Association,
Type & Sequence
TR1
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1 313 Sherman St„ Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />17 December 2012 <br />Douglas C. White, P.E. <br />Director of Technical Services <br />Western Fuels Association, Inc. <br />12050 N. Pecos Street, Suite 100 <br />Westminster, CO 80234 <br />Re: New Horizon North Mine (Permit No. C- 2010 -0$9) <br />Minor Revision No. 2 (MR -02) & Technical Revision No. 1 (TR -01) <br />Pond NHN -001 As- Built Certification - Preliminary Adequacy Review <br />Dear Mr. White: <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hiekonlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The application for MR -02 was received by the Division on 03 December 2012, and was deemed <br />complete, for purposes of filing, on the same day. With MR -02, WFC has provided as- <br />constructed documentation and certification for Sedimentation Pond NHN -001. <br />The Division has conducted a preliminary adequacy review of the materials submitted with MR- <br />02. We note that a number of changes to the original Arcadis design have been made, and <br />believe that review and approval of these changes would be more appropriately handled under <br />the Technical Revision (TR) process rather than as a Minor Revision (MR). We therefore <br />request that Western Fuels submit an application form for a TR, together with a letter requesting <br />that MR -02 be withdrawn. (There is no need to resubmit the original pages and map with the <br />TR -01 application, although a proposed Public Notice must be provided.) <br />The following section itemizes the adequacy comments made by the Division as a result of our <br />review of the MR -02 application. Please prepare and submit a response package addressing each <br />of these issues. <br />Rule 2.05.3(4) and 4.05.9 Ponds and Impoundments <br />Surface Water Hydrology <br />1. The designs (SEDCAD runs) submitted for the NHN -001 pond as -built indicate that the <br />primary discharge structure is a perforated riser, with 2" holes at the 5671.5' elevation. <br />Map 2.05.3(4) -6 and the photographs provided by the operator on December 6, 2012 <br />indicate that the primary spillway is a drop inlet riser at 5675.5' with two 6" gated weep <br />holes at 5671.5'. Since these weep boles are gated, two designs should be run - one <br />Office of Office of <br />Mined Land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.