Laserfiche WebLink
wof cw� COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />„� �$ MINERALS PROGRAM INSPECTION REPORT <br />W87 PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />Silica Quarry <br />M- 1977 -361 <br />Sandstone <br />Boulder <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Michael A. Cunningham <br />November 30, 2012 <br />11:30 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />CEMEX, Inc. <br />Patrick Fischer, Denise Arthur <br />110c - Construction Limited Impact <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Normal I &E Program <br />Partial Bond <br />$223,700.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />IN ECTOR'S SIGNATURE: <br />SIGNATURE DATE: <br />Clear <br />December 17, 2012 <br />The followinp, inspection topics were identified as havinp- Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Availability Of Records <br />PROBLEM /POSSIBLE VIOLATION: Problem: Current reclamation plan needs to be updated and clarified <br />pursuant to C.R.S. 34- 32.5 -116 (1). The operator must follow approved reclamation plan or provide sufficient <br />information to describe or identify how the operator intends to conduct reclamation. <br />CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br />update and clarify the current approved reclamation plan to reflect existing and proposed activities by the <br />corrective action date. <br />CORRECTIVE ACTION DUE DATE: 2/18/13 <br />Page I of 4 <br />