Laserfiche WebLink
C- 1981 -022 <br />PR -7 Findings <br />October 4, 2012 <br />landowner (4.03. 1 (1))f)(i)). <br />2. The Division has approved the location of a portion of the haul road in the <br />channel of an intermittent stream (Sanborn Creek) as depicted on Map No. <br />2.05 -M1 (4.03.1(2)(b)). <br />The Division has approved the location of a portion of the Elk Creek Haul <br />Road in the channel of Elk Creek, an ephemeral stream, as depicted on Map <br />No. 2.05 -M1 (4.03.1(2)(b)). <br />B. Access Roads <br />The Division has approved the location of a portion of the access road to the <br />lower Hubbard Creek facilities in the channel of a perennial stream as depicted <br />on Map No. 17, Section 2.05 of the permit application (4.03.2(2)(b)). This road <br />was constructed prior to 1977, and the culvert and associated fill across Hubbard <br />Creek will be removed upon cessation of mining (see p. 2.05 -53 and Exhibit <br />2.05 -E5.) <br />C. Light Use Roads <br />1. The Division has approved the location of a portion of the Bear Creek Fansite <br />Light Use Road in the channel of Bear Creek, an ephemeral stream, as depicted <br />on Drawing No. 2.05- E1 -BCA2 (4.03.3(2)(b)). <br />IL Support Facilities - Rule 4.04 <br />A. Construction of support facilities for the Sanborn Creek Tract resulted in the <br />relocation of a section of railroad track adjacent to the permit area. Upon receipt of <br />written approval from the railroad owner, the Division approved this activity. <br />(4.04(6)). <br />III. Hydrologic Balance - Rule 4.05 <br />A. Water Quality Standards and Effluent Limitations <br />The Division has approved small area exemptions from use of sediment ponds <br />due to the limited size of certain areas and due to the fact that ponds and <br />treatment facilities are not necessary for the drainage from these areas to meet <br />the effluent limitations of Rule 4.05.2 and applicable State and Federal water <br />quality standards for receiving streams, and also due to the fact that no mixing <br />of surface drainage with a discharge from underground workings will occur. <br />The small areas to be exempted are detailed in Exhibit 2.05 -3 (vol. 10). The <br />20 <br />