Laserfiche WebLink
C- 1981 -022 <br />PR -7 Findings <br />October 4, 2012 <br />COC- 61357. <br />• TR -68, approved April 28, 2010, allowed for a methane drainage borehole and electric driven <br />methane exhauster system. <br />• TR -69, approved July 7, 2010, revised the mine plan. <br />• TR -70, pending, proposed a borehole to recover methane from the abandoned and sealed <br />Sanborn Creek Mine workings. <br />• TR -71, approved August 29, 2011, modified the gob vent borehole plan. <br />• TR -72, pending, proposed to modify the gob vent borehole plan on surface managed by the <br />USFS within the Springhouse Park IRA. <br />• TR -73, approved February 17, 2012, allowed the construction of a coal mine, methane <br />fueled, electricity generator and relocation of an alluvial monitoring well. <br />Thirteen Minor Revisions (MRs) <br />• MR -88, approved May 13, 2009, modified the Bear Creek Fansite utility borehole sizes. <br />• MR -89, approved June 4, 2010, approved the addition of an air compressor building. <br />• MR -90, approved July 28, 2010, move one gob vent bore hole. <br />• MR -91, approve September 17, 2010, incorporate bore hole abandonment reports into the <br />PAP. <br />• MR -92, approved September 21, 2010, provided for two angle bore holes at existing pads. <br />• MR -93, approved December 20, 2010, provided for four angle bore holes at existing pads. <br />• MR -94, approved January 4, 2011, incorporated bore hole abandonment reports and an as- <br />built map for the Bear Creek Fansite. <br />• MR -95, approved March 22, 2011, provided for sixteen angle bore holes at existing pads. <br />• MR -96, approved June 1, 2011, provided for two angle bore holes at existing pads. <br />• MR -97, approved January 3, 2012, addition of ventilation fan at Bear Creek Fansite. <br />• MR -98, approved February 16, 2012, updated ownership and control information. <br />• MR -99, approved April 16, 2012, provided for four angle bore holes at existing pads. <br />• MR -100, approved June 25, 2012, incorporate COGCC well permit for methane fueled <br />electricity generation plant into PAP. <br />As the mine has been in operation since 1902, much of the disturbed area associated with the <br />mine was affected prior to the effective date of the Surface Mining Control and Reclamation Act <br />of 1977 and the Colorado Surface Coal Mining Reclamation Act. Baseline environmental <br />factors were not measured, and no topsoil was salvaged prior to previous disturbance. <br />Disturbances which have been conducted since the effective date of the Act have been permitted <br />and conducted in compliance with the Act and Regulations. These activities include the <br />Hubbard Creek Ventilation Fan No. 2 facility, the methane degas wells, the Sanborn Creek Tract, <br />the Elk Creek Facilities, the West Valley and II West Coal Refuse Facilities, and the new Bear <br />Creek Fansite Facility. All other areas of disturbance at the mine occurred prior to the effective <br />date of the Act. <br />All surfaces will be returned to the approximate original contour (AOC) with two exceptions. <br />14 <br />