Laserfiche WebLink
Brighton Total <br />Laramie -Fox Hills <br />Well Pumping to <br />Laramie -Fox Hills Well <br />Total Lagged <br />Month Depletions <br />River <br />Returns (2 %) <br />Aurora Lease Delivered <br />Transit Loss - 5%-10% <br />Net River Impact <br />Depletions <br />Aurora Lease <br />Aurora Lease <br />Total <br />(acre -feet) <br />(acre -feet) <br />(acre -feet) <br />(acre -feet) <br />Litvak <br />Obligation Litvak <br />Obligation Shores <br />Aurora Delivery <br />[ <br />[ <br />[ <br />( <br />[5] <br />[81 <br />[71 <br />[ <br />[ <br />[ <br />Jan -13 <br />-3.34 <br />1.16 <br />-0.02 <br />2.32 <br />-0.12 <br />0.00 <br />-1.49 <br />1.49 <br />13.12 <br />16.93 <br />Feb -13 <br />-3.11 <br />1.14 <br />-0.02 <br />2.10 <br />-0.11 <br />0.00 <br />-1.33 <br />1.33 <br />11.37 <br />14.80 <br />Mar -13 <br />-3.00 <br />1.10 <br />-0.02 <br />2.02 <br />-0.10 <br />0.00 <br />-1.65 <br />1.65 <br />0.00 <br />3.67 <br />Apr -13 <br />-3.09 <br />1.30 <br />-0.03 <br />2.02 <br />-0.20 <br />0.00 <br />-1.56 <br />1.56 <br />0.00 <br />3.58 <br />May -13 <br />-3.27 <br />1.06 <br />-0.02 <br />2.48 <br />-0.25 <br />0.00 <br />-1.51 <br />1.51 <br />0.00 <br />3.99 <br />Jun -13 <br />-3.49 <br />1.10 <br />-0.02 <br />2.68 <br />-0.27 <br />0.00 <br />-2.14 <br />2.14 <br />0.00 <br />4.82 <br />Jul -13 <br />-3.79 <br />1.79 <br />-0.04 <br />2.26 <br />-0.23 <br />0.00 <br />-1.85 <br />.1.85 <br />0.00 <br />4.11 <br />Aug -13 <br />-4.06 <br />1.74 <br />-0.03 <br />2.62 <br />-0.26 <br />0.00 <br />-1.91 <br />1.91 <br />0.00 <br />4.53 <br />Sep -13 <br />-4.19 <br />1.72 <br />-0.03 <br />2.78 <br />-0.28 <br />0.00 <br />-1.78 <br />1.78 <br />0.00 <br />4.56 <br />Oct -13 <br />-4.16 <br />2.11 <br />-0.04 <br />2.32 <br />-0.23 <br />0.00 <br />-2.29 <br />2.29 <br />0.00 <br />4.61 <br />Nov -13 <br />-3.92 <br />1.96 <br />-0.04 <br />2.10 <br />-0.11 <br />0.00 <br />-1.99 <br />1.99 <br />0.00 <br />4.09 <br />Dec -13 <br />-3.56 <br />1.50 <br />-0.03 <br />2.02 <br />-0.10 <br />-0.17 <br />-1.83 <br />1.83 <br />0.00 <br />3.85 <br />Total <br />-42.98 <br />17.68 <br />-0.35 <br />27.72 <br />-2.24 <br />-0.18 <br />-21.33 <br />21.33 <br />24.49 <br />73.5 <br />Notes: <br />[1] From Table 1, column [17] <br />[2] Pumping from New LFH well on HIBE property <br />[3] Retum flow obligation from LFH aquifer pumping - 2% <br />[4] Lease from Aurora <br />[5] River transit loss (0.5% per mile for April through October and 0.25% per mile for November through March from Metro WWTP) <br />[6] Net River Impact column[1] + column[2] + column[3] +column[4] + column[51 <br />[7] From the bestway concret denverPotval Augmentation plan. <br />[8] Equals Column [7]. <br />[9] From the Shores 2013 SWSP <br />[10] Equals Column [4] plus Column [8] plus Column [9]. <br />11/27/2012 <br />Table 3 <br />Brighton Pit <br />REPLACEMENT OPERATIONS <br />