My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-12_HYDROLOGY - M1997058
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1997058
>
2012-12-12_HYDROLOGY - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:20 PM
Creation date
12/14/2012 9:39:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
HYDROLOGY
Doc Date
12/12/2012
Doc Name
SWSP
From
OSE
To
Civil Resources, LLC
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Andy Rodriguez, P.E. <br />Bestway's Brighton Combined SWSP <br />December 12, 2012 <br />Page 5 of 5 <br />14. Dewatering at this site will produce delayed depletions to the stream system. As long as <br />the pit is continuously dewatered, the water returned to the stream system should be <br />adequate to offset the depletions attributable to the dewatering operation. If dewatering <br />at the site ceases, the delayed depletions must be addressed. At least three years prior <br />to completion of dewatering, a plan must be submitted that specifies how the post <br />pumping dewatering depletions (including refilling of the pit) will be replaced, in time, <br />place and amount. <br />15. To assure that depletions from groundwater evaporation do not occur in the unforeseen <br />event, or events, that would lead to the abandonment of the pits, the applicant, through <br />DRMS, holds a bond in the amount of $974,000.00 for the Parker - Dersham Pit and <br />$711,750.00 for the Baseline Pit for lining or backfilling of the pit has been obtained. <br />Therefore, in case of abandonment the bond can finance the completion of the lining of <br />the pit or the backfilling, thus preventing depletions to the stream system. <br />16. In accordance with amendments to Section §25 -8- 202 -(7), C.R.S. and "Senate Bill 89 -181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall determine if <br />this substitute water supply plan is of a quality to meet requirements of use to which the <br />senior appropriation receiving the substitute supply has normally been put. As such, water <br />quality data or analyses may be requested at any time to determine if the requirement of <br />use of the senior appropriator is met. <br />17. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />water court case or any other legal action that may be initiated concerning the substitute <br />water supply plan. This decision shall not bind the State Engineer to act in a similar <br />manner in any other applications involving other plans or in any proposed renewal of this <br />plan, and shall not imply concurrence with any findings of fact or conclusions of law <br />contained herein, or with the engineering methodologies used by the Applicant. <br />Should you have any questions, please contact Joanna Williams of this office or Jonathan <br />Hernandez of our Division office in Greeley at (970) 352 -0742. <br />Sincerely, <br />eathera e, P.E. <br />of Water Supply <br />Attachments: Tables 1 & 3 <br />City of Aurora Lease <br />Administration Protocol "Augmentation Plan Accounting, Division One — South Platte River" <br />cc: Jonathan Hernandez, Water Resource Engineer, jonathan .hernandezastate.co.us <br />810 9th Avenue, Suite 200, Greeley, Colorado 80631, (970)- 352 -8712 <br />William Schneider, Water Commissioner District 2, william.schneiderRstate.co.us <br />810 9 Avenue, Suite 200, Greeley, Colorado 80631, (970) 381 -0828 <br />Division of Reclamation, Mining and Safety <br />JD /JMH /Approval_2013 Parker Dersham_Baseline.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.