My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-12_HYDROLOGY - M2004013
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2004013
>
2012-12-12_HYDROLOGY - M2004013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:20 PM
Creation date
12/14/2012 9:39:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004013
IBM Index Class Name
HYDROLOGY
Doc Date
12/12/2012
Doc Name
SWSP
From
OSE
To
Martin and Wood Water Consultants, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-.- - <br />( <br />( <br />( <br />( <br />MONTH <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br />CREDIT /DEPLETION <br />FROM REFILLING <br />TOTAL LAGGED <br />DEPLETIONS <br />PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />JAN <br />0 82 <br />0 00 <br />1 59 <br />1 61 <br />FEB <br />0 97 <br />0 00 <br />1 37 <br />1 38 <br />MAR <br />1 34 <br />0 00 <br />1 55 <br />1.57 <br />APR <br />2 39 <br />0 00 <br />1 70 <br />1 72 <br />MAY <br />3 21 <br />0 00 <br />2 16 <br />2.18 <br />JUN <br />395 <br />000 <br />251 <br />254 <br />JUL <br />373 <br />00D <br />292 <br />295 <br />AUG <br />3 36 <br />0 00 <br />2 96 <br />2 99 <br />SEP <br />2 69 <br />0 00 <br />2 77 <br />2 80 <br />OCT <br />1 94 <br />0.00 <br />2 60 <br />2 63 <br />NOV <br />1 04 <br />0 00 <br />2 14 <br />2 16 <br />DEC <br />0 75 <br />0 0D <br />1 83 <br />1 85 <br />TOTAL <br />26 19 <br />0 DO <br />26 10 <br />26 38 <br />-.- - <br />( <br />( <br />( <br />( <br />MONTH <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br />CREDIT /DEPLETION <br />FROM REFILLING <br />TOTAL LAGGED <br />DEPLETIONS <br />PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />JAN <br />0 82 <br />0 00 <br />1 69 <br />1 71 <br />FEB <br />0 97 <br />0 00 <br />1 45 <br />1 46 <br />MAR <br />134 <br />0.00 <br />162 <br />164 <br />APR <br />2 39 <br />0 00 <br />1 76 <br />1 78 <br />MAY <br />3.21 <br />0.00 <br />2 22 <br />2 24 <br />JUN <br />4 11 <br />-2 75 <br />0 00 <br />0 00 <br />JUL <br />3 91 <br />0 05 <br />3 04 <br />3 07 <br />AUG <br />3 36 <br />2.75 <br />3,49 <br />3 52 <br />SEP <br />2 69 <br />0 00 <br />3.54 <br />3 58 <br />OCT <br />1 94 <br />0.00 <br />2 98 <br />3 01 <br />NOV <br />1 04 <br />0.00 <br />2 37 <br />2 39 <br />DEC <br />0 75 <br />0,00 <br />2 00 <br />2 02 <br />TOTAL <br />26 53 <br />0 00 <br />26 16 <br />26 42 <br />-.- - <br />(1) <br />(2) <br />(3) <br />(4) <br />MONTH <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br />CREDIT /DEPLETION <br />FROM REFILLING <br />TOTAL LAGGED <br />DEPLETIONS <br />PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />JAN <br />0 82 <br />0 00 <br />1.56 <br />1 58 <br />FEB <br />0 97 <br />0 00 <br />1 35 <br />1 36 <br />MAR <br />1 34 <br />0 00 <br />1 53 <br />1 55 <br />APR <br />2 39 <br />0 00 <br />1.68 <br />1 70 <br />MAY <br />3 21 <br />0 00 <br />2 14 <br />2 16 <br />JUN <br />3 95 <br />0 00 <br />2 50 <br />2 53 <br />JUL <br />3 73 <br />0 00 <br />2 90 <br />2.93 <br />AUG <br />3 36 <br />0 00 <br />2 95 <br />2 98 <br />SEP <br />2 69 <br />0 00 <br />2 75 <br />2 78 <br />OCT <br />1 94 <br />0 00 <br />2 59 <br />2 62 <br />NOV <br />1 04 <br />0 00 <br />2 13 <br />2 15 <br />DEC <br />0 75 <br />0 00 <br />1 82 <br />1 84 <br />TOTAL <br />26,19 <br />0 00 <br />25.90 <br />26.18 <br />-.- - <br />- - (1) <br />- ( <br />( <br />( <br />MONTH <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br />CREDIT /DEPLETION <br />FROM REFILLING <br />TOTAL LAGGED <br />DEPLETIONS <br />PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />(ACRE -FEET) <br />JAN <br />0 82 <br />0 00 <br />1 56 <br />1 58 <br />FEB <br />0 97 <br />0 00 <br />1 35 <br />1 36 <br />MAR <br />1 34 <br />0 00 <br />1 53 <br />1.55 <br />APR <br />2 39 <br />0 00 <br />1 68 <br />1.70 <br />MAY <br />3 21 <br />0 00 <br />2 14 <br />2 16 <br />JUN <br />4 11 <br />-2 75 <br />0 00 <br />0 00 <br />JUL <br />391 <br />000 <br />297 <br />300 <br />AUG <br />336 <br />275 <br />343 <br />346 <br />SEP <br />269 <br />000 <br />348 <br />351 <br />OCT <br />1 94 <br />0 00 <br />2 93 <br />2 96 <br />NOV <br />1 04 <br />0 00 <br />2 33 <br />2 35 <br />DEC <br />0 75 <br />0 00 <br />1 96 <br />1.98 <br />TOTAL <br />26 53 <br />0 00 <br />25 36 <br />25 61 <br />SCENARIO A- MINING OCCURS AND POND 5 REFILLS IN AUGUST FOLLOWING MINING <br />NOTES <br />(1) COL (8) - (FROM TABLE 1) <br />(2) BASED ON 2 FT FILL DEPTH OF POND 5 AND DIMENSIONS OF 300' BY 200' (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN JUNE WHEN PIT IS DEWATERED THE DEPLETION <br />CAUSED BY REFILLING IS LAGGED TO THE SOUTH PLATTE RIVER AS IF IT WERE AN <br />EVAPORATION OR OPERATIONAL LOSS) <br />(3) BASED ON STREAM DEPLETION MODEL (CANNOT BE NEGATIVE) <br />(4) COL (3) + 1% TRANSIT LOSS <br />SCENARIO Et- NO MINING OCCURS AND NO REFILLING OCCURS <br />Year2013 <br />NOTES <br />(1) COL (8) - (FROM TABLE 1) <br />(2) NO REFILLING UNDER THIS SCENARIO <br />(3) BASED ON STREAM DEPLETION MODEL <br />(4) COL (3) + 1% TRANSIT LOSS <br />TABLE 2 <br />TOTAL LAGGED STREAM DEPLETIONS FOR YEARS 2013 AND 2014 <br />ST BARBARA SAND AND GRAVEL MINE <br />Memn and Wood Water Consultants Inc <br />a 1 <br />NOTES <br />(1) COL (8) - (FROM TABLE 1) <br />(2) BASED ON 2 FT FILL DEPTH OF POND 5 AND DIMENSIONS OF 300' BY 200' (CREDIT IS <br />OBTAINED INSTANTANEOUSLY FOR CREDIT IN JUNE WHEN PIT IS DEWATERED. THE DEPLETION <br />CAUSED BY REFILLING IS LAGGED TO THE SOUTH PLATTE RIVER AS IF IT WERE AN <br />EVAPORATION OR OPERATIONAL LOSS) <br />(3) BASED ON STREAM DEPLETION MODEL (CANNOT BE NEGATIVE) <br />(4) COL (3) + 1% TRANSIT LOSS <br />NOTES <br />(1) COL (8) - (FROM TABLE 1) <br />(2) NO REFILLING UNDER THIS SCENARIO <br />(3) BASED ON STREAM DEPLETION MODEL <br />(4) COL (3) + 1% TRANSIT LOSS <br />
The URL can be used to link to this page
Your browser does not support the video tag.